21-124 Rolling Hills Community Sewer

design documents in coordination with IHS.  Piping and pump locations have been selected and the final design documents are being produced.  A forthcoming formal notice will be issued…

https://oneida-nsn.gov/wp-content/uploads/2024/03/21-124-Rolling-Hills-Community-Sewer.pdf?_rt=NTMxfDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=cc766d2d00

21-114 Sacred Burial Grounds Expansion

…of the parcel will be used. Current Status:  OES completed concept design (see page 2).  The proposed layout includes 3,780 new plots.  Design Plans have been submitted…

https://oneida-nsn.gov/wp-content/uploads/2024/03/21-114-Sacred-Burial-Grounds-Expansion.pdf?_rt=NTMyfDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=ea3553c7e0

09-011 OCHD Integrated Campus

…Space programming and the Preliminary design process will commence in the coming weeks with Architectural design firm. Schedule: Approvals – On going process Design – T.B.D. Bidding – T.B.D. Construction…

https://oneida-nsn.gov/wp-content/uploads/2022/09/09-011-OCHD-Integrated-Campus.pdf?_rt=NTMzfDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=980d237ef5

22-105 Mission Park Renovations

design services and prepare construction costs. Current Status: OES presented various design concepts to the project team. The team is currently reviewing the presented options with the intent to select…

https://oneida-nsn.gov/wp-content/uploads/2022/10/22-105-Mission-Park-Renovations.pdf?_rt=NTM0fDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=fa1481852d

21-105 Orchard Buildings

design with design firm and project team. Also initiated discussions with the DOT regarding a new easement along STH-54. Schedule: Approvals – Complete Bidding– Complete Design – TBD Construction –…

https://oneida-nsn.gov/wp-content/uploads/2024/03/21-105-Orchard-Buildings.pdf?_rt=NTM1fDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=056c194e28

08-11-10-A Resolution in Support of the Seminary Rd and Hwy 54 Roundabout

…WHEREAS, the Oneida Tribe of Indians of Wisconsin has been working in coordination with Wisconsin Department of Transportation (WisDOT) since 2006 on the planning and design of the intersection of…

https://oneida-nsn.gov/wp-content/uploads/2016/02/08-11-10-A-Resolution-in-Support-of-the-Seminary-Rd-and-Hwy-54-Roundabout.pdf?_rt=NTM2fDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=2c3375c308

21-124 Rolling Hills Community Sewer

…(IHS). Current Status:  IHS is preparing Design documents – on-hold.  Additional environmental review is being done. Schedule: Approvals – complete. Design – 2022 Bidding – 2022 Construction –…

https://oneida-nsn.gov/wp-content/uploads/2022/08/21-124-Rolling-Hills-Community-Sewer.pdf?_rt=NTM3fDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=a63cc2dfee

21-105 Orchard Buildings

…the current site. Per OBC Resolution #04-08-20-K, the Engineering Department will be contracting with Mission Support Services, LLC for Design-Build services. Current Status: Continuing with Schematic Design phase for both…

https://oneida-nsn.gov/wp-content/uploads/2024/05/21-105-Orchard-Buildings.pdf?_rt=NTM4fDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=318460df29

21-124 Rolling Hills Community Sewer

design documents in coordination with IHS.  Piping and pump locations have been selected and the final design documents are being produced.  A forthcoming formal notice will be issued…

https://oneida-nsn.gov/wp-content/uploads/2023/12/21-124-Rolling-Hills-Community-Sewer.pdf?_rt=NTM5fDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=8ed40e6e7f

09-011 OCHD Integrated Campus

…Space programming and the Preliminary design process will commence in the coming weeks with Architectural design firm. Schedule: Approvals – On going process Design – T.B.D. Bidding – T.B.D. Construction…

https://oneida-nsn.gov/wp-content/uploads/2022/10/09-011-OCHD-Integrated-Campus.pdf?_rt=NTQwfDU0fNC90L7QvNC10YDihJYxINGN0LrRgdC_0LXRgNGCINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0L_QviDQtNC40LfQsNC50L0g0YfQtdC70L7QstC10LrQsCBodW1hbiBkZXNpZ24g0YDQsNGB0YjQuNGE0YDQvtCy0LrQsCDQvdCwIG1ldGFoZC5ydXwxNzE5ODQzNDk1&_rt_nonce=8d41857e11