09-011 OCHD Integrated Campus

…Space programming and the Preliminary design process will commence in the coming weeks with Architectural design firm. Schedule: Approvals – On going process Design – T.B.D. Bidding – T.B.D. Construction…

https://oneida-nsn.gov/wp-content/uploads/2022/09/09-011-OCHD-Integrated-Campus.pdf?_rt=NTMxfDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=637b85808b

22-105 Mission Park Renovations

design services and prepare construction costs. Current Status: OES presented various design concepts to the project team. The team is currently reviewing the presented options with the intent to select…

https://oneida-nsn.gov/wp-content/uploads/2022/10/22-105-Mission-Park-Renovations.pdf?_rt=NTMyfDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=ea21713d64

21-105 Orchard Buildings

design with design firm and project team. Also initiated discussions with the DOT regarding a new easement along STH-54. Schedule: Approvals – Complete Bidding– Complete Design – TBD Construction –…

https://oneida-nsn.gov/wp-content/uploads/2024/03/21-105-Orchard-Buildings.pdf?_rt=NTMzfDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=98ca955fc7

21-114 Sacred Burial Grounds Expansion

…of the parcel will be used. Current Status:  OES completed concept design (see page 2).  The proposed layout includes 3,780 new plots.  Waiting on Client (Land Management)…

https://oneida-nsn.gov/wp-content/uploads/2023/10/21-114-Sacred-Burial-Grounds-Expansion.pdf?_rt=NTM0fDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=5997c08ff8

21-114 Sacred Burial Grounds Expansion

…of the parcel will be used. Current Status:  OES contract for design services has been approved.  Property topographic survey is scheduled for 9/29/22.  Design kick-off meeting is…

https://oneida-nsn.gov/wp-content/uploads/2022/10/21-114-Sacred-Burial-Grounds-Expansion.pdf?_rt=NTM1fDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=ce26f7600f

21-124 Rolling Hills Community Sewer

…(IHS). Current Status:  IHS is preparing Design documents – on-hold.  Additional environmental review is being done. Schedule: Approvals – complete. Design – 2022 Bidding – 2022 Construction –…

https://oneida-nsn.gov/wp-content/uploads/2022/08/21-124-Rolling-Hills-Community-Sewer.pdf?_rt=NTM2fDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=2b90571e39

21-124 Rolling Hills Community Sewer

design documents in coordination with IHS.  Piping and pump locations have been selected and the final design documents are being produced.  A forthcoming formal notice will be issued…

https://oneida-nsn.gov/wp-content/uploads/2023/12/21-124-Rolling-Hills-Community-Sewer.pdf?_rt=NTM3fDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=46553046d1

21-123 NHC Head Start Canopy Improvements

…Development phase with design firm, Somerville, Inc. and project team. Schedule: Approvals – Complete Bidding– Complete Design – In Process Construction – To be Determined Project Partners: Engineering, Public Transit,…

https://oneida-nsn.gov/wp-content/uploads/2022/05/21-123-NHC-Head-Start-Canopy-Improvements-1.pdf?_rt=NTM4fDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=0ac0ff64d6

08_05_22_Kali Web

…will be available in the room block. Event details coming soon. Call 920.494.7300 today! Ask for the bicentennial rate. Carter King Theatre and Design Major By Kalihwisaks Staff Carter S….

https://oneida-nsn.gov/wp-content/uploads/2022/08/08_05_22_Kali-Web.pdf?_rt=NTM5fDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=b8ae97d053

21-114 Sacred Burial Grounds Expansion

…of the parcel will be used. Current Status:  OES completed concept design (see page 2).  The proposed layout includes 3,780 new plots.  Client (Land Management) will be…

https://oneida-nsn.gov/wp-content/uploads/2023/09/21-114-Sacred-Burial-Grounds-Expansion.pdf?_rt=NTQwfDU0fNC00LjQt9Cw0LnQvSDRh9C10LvQvtCy0LXQutCwINCy0LjQutGC0L7RgNC40Y8g0LTQttC10Lwg0YLQvtC_0L7QstGL0Lkg0YHQv9C10YbQuNCw0LvQuNGB0YIg0LTQuNC30LDQudC9INGH0LXQu9C-0LLQtdC60LAgaHVtYW4gZGVzaWduIG1ldGFoZC5ydXwxNzIwMzI5NTkx&_rt_nonce=3459a1fac2